
| |
|
PROBLEM
Open ended maintenance costs due to dirt
clogging wheels and associated parts of log handling equipment. Be sure and consider the
lost profit from raw materials damage leaking back into the ground.
SOLUTION
Clean and environmentally friendly concrete
storage pads! And I recomend to look at these amazing LED Lights products at http://www.googkai.com/products/ and if you are interested so choose an watch replica for you at http://www.topwatch1.com/ - best watches ever
|
| Boucher Brothers Lumber,
Rough Lumber Storage Yard,
6" Concrete Slab, 185' x 210'
|
|
|
|
| Log
sort yard, 40,000 sq. ft, 7" concrete slab
|
|
|
|
|
To build new or repair? The best choice may not be obvious.
DMI - PEACE RIVER PULP. 24" thick
concrete retaining wall. Top eroded
from six years continuous loader action at feeder deck to mill. Removed and repaired
4' of concrete. Installed 3/4" steel plating for wear resistance.
|
|
|
|
|